D.1.1 | Geodatabase of Cystoseira distribution | HAO-DEMETER, FSB | R | PU | 8 | Accepter |
D.1.2 | A report detailing the distribution of damaged Cystoseira forests in the Mediterranean Sea and an outline of the principal drivers of degradation | HAO-DEMETER, FSB | R | PU | 12 | Accepter |
D.1.3 | A map detailing the location of the priority areas for the restoration of Cystoseira meadows in the Mediterranean | HAO-DEMETER, FSB | R | PU | 16 | Accepter |
D.1.4 | Indicators of restoration success of ecosystem functions and service delivery | FSB, HAO-DEMETER | R | PU | 36 | Accepter |
D.2.1.1 | Temperature, pollution and nutrients thresholds for different Cystoseira species | UdG, SZN | R | PU | 24 | Accepter |
D.2.1.2 | Specific protocols for ex situ recruitment culture for each species | UdG, SZN | R | PU | 24 | Accepter |
D.2.2 | Populations trans-regional thermal stress comparative tolerance | UdG, SZN Contribution: HAO-DEMETER | R | PU | 24 | Accepter |
D.2.3 | Models of the future vulnerable and resistant Cystoseira populations within the Mediterranean basin | UdG, SZN | R | PU | 30 | Accepter |
D.3.1 | Restoration protocols for Cystoseira spp. | SZN, UV | R | PU | 24 | Accepter |
D.3.2 | Role of herbivory across the Mediterranean Sea on restoration success | SZN, UV | R | PU | 30 | Accepter |
D.3.3 | Roadmap: scaling up algal forest restoration in the Mediterranean Sea | SZN, UV | R | PU | 36 | Accepter |
D.4.1 | Maps in GIS format of pilot sites location and information on changes in ecosystem services following habitat restoration using different techniques | WCMC | R | PU | 25 | Accepter |
D.4.2 | Spatially explicit maps showing variation in the recovery potential of different ecosystem services | WCMC | R | PU | 30 | Accepter |
D.4.3 | Assessment of ecosystem change, recovery success and ecosystem service change following restoration.
Link: http://afrimed-project.eu/wp-content/uploads/2023/08/AFRIMED_Deliverable-4_3_WCMC_final_Aprl2023.pdf | WCMC | R | PU | 30 | Accepter |
D.4.4 | Assessment of the social and economic benefits of changing ecosystem services generated by restoration and the cost effectiveness of restoration interventions
Link: http://afrimed-project.eu/wp-content/uploads/2023/08/AFRIMED_Deliverable-4_4_revised_13_06.pdf | WCMC | R | PU | 30 | Accepter |
D.4.5 | Policy briefing summarising the key transferable finding from Tasks 5.1-3 | WCMC | R | PU | 35 | Accepter |
D.5.1 | List of stakeholders and communication supports (synthesis of the project, questionnaire) | UNS, HCMR | DEC | PU | 9 | Accepter |
D.5.2 | Report of the first stakeholder meeting | UNS, HCMR | R | CO | 24 | Accepter |
D.5.3 | Report of the second stakeholder meeting | UNS, HCMR | R | CO | 30 | Accepter |
D.5.4 | Synthesis of outputs and best practices for Mediterranean reforestation | UNS, HCMR | R | PU | 36 | Accepter |
D.5.5 | Manuscript on best practices for reforestation | UNS, HCMR | O | PU | 36 | Accepter |
D.6.1 | Dissemination plan (revised every year) | ECOREACH | R | PU | 3 | Accepter |
D.6.2 | AFRIMED project homepage, Intranet with project | ECOREACH | DEC | PU | 3 | Accepter |
D6.3 | First Year report on networking, public engagement and communication activities including collation of products and e-AFRIMED tools | ECOREACH | R | CO | 12 | Accepter |
D6.4 | Second Year report on networking, public engagement and communication activities including collation of products and e- AFRIMED tools | ECOREACH | R | CO | 24 | Accepter |
D6.5 | Third Year report on networking, public engagement and communication activities including collation of products and e- AFRIMED tools | ECOREACH | R | CO | 35 | Accepter |
D.7.1 | Minutes of the Kick-Off | UNIVPM | R | CO | 3 | Accepter |
D.7.2 | Data management plan | ECOREACH | R | CO | 5 | Accepter |
D.7.3 | Minutes of the first Annual Meeting | UNIVPM | R | CO | 12 | Accepter |
D.7.4 | Minutes of the second Annual Meeting | UNIVPM | R | CO | 24 | Accepter |
D.7.5 | Summary of the final meeting | UNIVPM | R | CO | 36 | Accepter |